The Challenge
- →Moving 2-tonne LED screen towers through convention centre service corridors
- →Relocating stage decking systems across polished exhibition floors
- →Working within strict noise curfews in city-centre venues
- →Fast turnarounds — multiple venue moves in a single day
- →Moving rigging and production carts with no forklift access inside halls
The Traxon Solution
Challenge: Noise restrictions
Battery-electric with near-silent operation — safe to use during live broadcast and in early-morning venue access windows.
Challenge: Floor protection in finished venues
Rubber tracks with optional floor protection kit — approved for use on polished concrete, hardwood, and exhibition carpet.
Challenge: Narrow service corridors
Scarab X5 fits service corridors from 700mm wide, covering LED panels, audio equipment, and production carts.
Challenge: Fast setup turnaround
Wireless remote, no setup rigging, and a 2-minute load time means stage moves happen on the crew's schedule, not the machine's.
Recommended
700mm
minimum corridor
Case Studies
Get Started