The Challenge
- →Moving mining equipment through 900mm–1.2m tunnel access ways
- →Replacing worn conveyor drives and pulleys without partial demolition
- →Operating in classified hazardous zones
- →Relocation of pump stations and electrical substations
- →Minimal head height and no overhead crane coverage
The Traxon Solution
Challenge: Tunnel and adit access
Compact footprint and rubber tracks allow operation in tunnels and underground drives where wheeled equipment cannot enter.
Challenge: Conveyor maintenance moves
The Scarab X5 handles full-weight conveyor head drive assemblies, eliminating the need for temporary structures.
Challenge: No overhead lift points
Self-loading with platform height of 160mm loaded — pairs with existing ground-level jacking and skidding processes.
Challenge: Remote operation safety
100m wireless remote keeps operators clear of pinch points and hazardous material paths during the entire move.
Recommended
4,000 lbs
underground
Case Studies
Get Started