Utilities & Energy

Critical infrastructure moves — no margin for error.

The Challenge

  • Moving 5,000 lbs transformers into existing electrical substations
  • Installing switchgear in fully energised rooms with no shutdown window
  • Moving equipment across cable-strewn network operations centres
  • Precision placement onto transformer pads and cable boxes
  • Night and weekend moves to minimise supply disruption

The Traxon Solution

Challenge: Energised environment restrictions

Battery-electric — no exhaust, no spark risk. Safe to operate adjacent to live switchgear and transformer bays.

Challenge: Sub-station narrow-access bays

At 980mm, the Scarab X5 enters standard sub-station access doors loaded with 4,000 lbs of transformers.

Challenge: Cable floor crossing

Low track ground pressure and slow creep speed prevent damage to cable trays and protection mat systems.

Challenge: Night-shift safety

LED work lighting kit and reflective safety-yellow track option. Single-operator 100m remote reduces personnel exposure.

Recommended

Recommended for Utilities & Energy

SCARAB X5

4,000 kg payload

View Specs

4,000 lbs

transformer ready

Case Studies

Get Started

Have a Utilities job?